Connect with us

Announcements

72 km of coastal regeneration project ‘Dubai Mangroves’ unveiled

Published

on

Dubai Mangroves, a groundbreaking initiative has been unveiled, setting new standards for coastal regeneration. The project is spearheaded by URB, the same masterminds of the Dubai Reefs Project and The Loop in Dubai. This initiative aims to integrate ecological preservation with urban development, enhancing Dubai’s coastline with a vision of planting more than 100 million mangrove trees over 72 kilometers. This proposal aligns with the city’s environmental goals and the objectives of the Dubai 2040 Master Plan, focusing on urban resilience, biodiversity, and sustainable planning.

At the heart of this initiative are Mangroves, known for their unique ability to sequester carbon, protect coastal areas from erosion, and support for marine life and food security. With the capacity to absorb approximately 12.3 kg of CO2 annually per tree, the entire project can sequester 1.23 million tonnes of CO2 each year, the equivalent of removing the CO2 emitted by more than 260,000 gasoline-powered passenger vehicles from the roads each year.

Baharash Bagherian, CEO of URB, highlights the project’s vision: “Dubai mangroves is a testament of how urban and environmental innovation can work in harmony as a model for cities worldwide, demonstrating the transformative power of integrating ecological preservation with urban growth. Yet this project is much more than coastal regeneration or resilience; it’s about setting a global standard for how cities can balance the needs of the planet with the needs of the people.”

The project also includes various edutainment assets, such as the Mangrove Visitor Hub, designed to educate and engage the community and visitors about the importance of mangroves and the broader environmental challenges facing our planet. The Hub, alongside the Botanical Museum and the Nature Reserve Conservation Center, will serve as platforms for research, education, and advocacy, promoting environmental stewardship among residents and tourists alike.

The project is currently at the research stage with 6 pilot design studies proposed across selected areas. Each zone will serve as a model for how diverse infrastructural elements can be harmoniously combined with mangrove restoration efforts to create multifunctional coastal landscapes that offer ecological, recreational, and aesthetic benefits.

Announcements

Dubai traffic alert: Key roads, including Sheikh Zayed Road, to close on New Year’s Eve

Published

on

Dubai will implement gradual road closures on New Year’s Eve, including major routes such as Sheikh Zayed Road, starting from 4 PM on December 31, according to a senior official from the Roads and Transport Authority (RTA).

Residents and visitors planning to visit Downtown Dubai or other popular fireworks destinations are advised to begin their journeys early and rely on public transport, said Hussain Al Bana, Executive Director of Traffic at the RTA. He urged those not attending festivities in these areas to leave early and reminded guests with bookings near the celebrations to arrive before 4 PM.

The road closure schedule includes:

  • Sheikh Mohammed Bin Rashid Boulevard: From 4 PM
  • Financial Centre Street (Lower Deck): From 4 PM
  • Al Mustaqbal Street: From 4 PM
  • Burj Khalifa Street: From 4 PM
  • Al Asayel Road (Oud Metha to Burj Khalifa): From 4 PM
  • Al Sukuk Street: From 8 PM
  • Upper Level of Financial Road: From 8 PM
  • Sheikh Zayed Road: Gradual closure from 11 PM

To accommodate workers and ensure safety, authorities have designated viewing zones featuring large screens and meal services in collaboration with the Permanent Committee for Labour Affairs. Dedicated family-only viewing areas have also been arranged, with additional details forthcoming.

Enhanced Parking Facilities

The RTA has arranged approximately 20,000 additional parking spaces at Dubai Mall, Zabeel, and Emaar Boulevard to cater to visitors. Alternative parking options at Al Wasl and the GDRFA parking lots will also be available, with free shuttle buses provided for convenience.

Metro users can park at Centerpoint, Etisalat e&, and Jebel Ali stations for easier access to celebration venues. Note that the Dubai Water Canal Footbridge and elevators will close at 4 PM.

Citywide Celebrations

As Dubai rings in 2025, a total of 36 locations across the city will host spectacular celebrations. Highlights include fireworks displays at Burj Park, Global Village, Dubai Festival City Mall, Al Seef, Bluewaters, The Beach at JBR, and Hatta.

Authorities encourage the public to use public transport and plan their journeys in advance to enjoy a smooth and memorable New Year’s Eve.

Continue Reading

Announcements

Dubai Metro rolls Out 43-hour nonstop operations for New Year’s Eve

Published

on

Dubai Metro and Tram services will operate nonstop for over 43 hours starting December 31, according to a senior official from the Roads and Transport Authority (RTA).

This initiative is designed to alleviate congestion during New Year celebrations, encouraging the public to rely on public transport for a smoother journey. Dubai Metro will run continuously from 5 AM on December 31 until the end of January 1, while Dubai Tram will operate from 6 AM on December 31 until 1 AM on January 2.

Additionally, the RTA will deploy a fleet of 1,400 buses, available free of charge, to further support public transportation. The RTA, highlighted that the extended Metro and Tram services, increased parking facilities, and free bus rides are part of the authority’s efforts to provide convenient travel options and reduce traffic congestion for celebrators.

Continue Reading

Announcements

Traffic Relief: Dubai opens new bridge, slashes travel time from 15 to 3 minutes

Published

on

A new 1km bridge opened on Sunday in Dubai, greatly easing traffic flow from Hessa Street to Al Khail Road, the Roads and Transport Authority (RTA) announced.

The two-lane bridge has reduced travel time from Hessa Street to Al Khail Road from 15 minutes to just three minutes, the RTA added. The bridge ensures a “seamless” traffic connection to Dubai’s city centre and Dubai International Airport.

RTA also announced that 54 per cent of the Dh689 million Hessa Street development project, which includes upgrades of four major intersections, has been completed. All intersections are expected to be fully operational by the fourth quarter of 2025.

Mattar Al Tayer, Director-General, Chairman of the Board of Executive Directors of the Roads and Transport Authority (RTA), said the Hessa Street development project, spanning 4.5km from its intersection with Sheikh Zayed Road to its intersection with Al Khail Road, represents a continuation of efforts to develop road infrastructure to keep pace with the emirate of Dubai’s continuous growth.

Continue Reading

Popular

© Copyright 2024 HEADLINE. All rights reserved

Exit mobile version
https://headline.ae/