Connect with us

News

Commercial operation at unit 2 of Barakah nuclear power plant starts

Published

on

Spread the love

The Barakah Nuclear Power Plant is a positive success story that signifies the cooperation and collective action between various stakeholder organisations and authorities, a Wam report said.

The Emirates Nuclear Energy Corporation (ENEC), in cooperation with its partners, is a major player in the development of the country’s peaceful nuclear programme.

ENEC on Thursday (March 24) issued a recent report marking the commercial operation of Barakah’s second reactor, which highlights the fact that the Federal Authority for Nuclear Regulation (Fanr) has reviewed more than 15,000 pages of the application for obtaining an operating licence before granting it for the first unit in 2020 and the second unit in 2021.

Fanr has currently conducted more than 360 inspections at the plant to ensure that it meets all regulatory requirements, and 44 relevant reviews have been completed by international experts, such as the World Nuclear Association and the International Atomic Energy Agency.

The plant is a major contributor to the country’s initiative to achieve climate neutrality by 2050, and is the largest single source of environmentally-friendly electricity in the region.

Upon completion, the plant will generate 5,600 megawatts of environmentally-friendly electricity, which will cover 25 per cent of the UAE’s electricity needs while reducing carbon emissions by 22.4 million tonnes annually.

Construction work on the plant’s first reactor began in 2012 and the remaining work has continued to progress steadily. The construction of the third reactor was completed in November 2021 and its operating systems have been delivered in order to obtain an operating licence from Fanr, which is expected to happen this year.

Construction work on the fourth reactor has reached its final stages, and it is currently 92 percent completed while the overall level of completion of the four reactors stands at 96 percent.

The plant has four third-generation APR1400 reactors, each with an operating life of 60 years.

ENEC and its subsidiaries employ more than 3,000 people from about 50 different nationalities, 60 per cent of whom are Emirati nationals, and women constitute 20 per cent of the total workforce.

News

Two new Etihad Rail passenger stations to open in Abu Dhabi this November

Published

on

Spread the love

Etihad Rail’s passenger network is expanding, with two new stations in Abu Dhabi’s Al Dhafra region set to open on November 30.

The opening date for the Madinat Zayed and Liwa stations was confirmed after Sheikh Hamdan bin Zayed Al Nahyan, Ruler’s Representative in Al Dhafra, met Etihad Rail officials at Al Nakheel Palace on Wednesday.

According to the Abu Dhabi Media Office, Sheikh Hamdan directed that both stations be operational in time for Abu Dhabi’s busy festival and entertainment season, making travel easier for residents and visitors.

Where are the new stations?

Madinat Zayed: The station will connect one of the Al Dhafra region’s largest towns to the UAE’s national passenger rail network.

Liwa: Located in the famous Liwa Oasis, the station is expected to improve access to the region’s iconic desert attractions.

Passenger network rollout

The UAE officially launched Etihad Rail’s passenger service on June 30, with three daily services operating between Mohammed Bin Zayed City in Abu Dhabi and Al Hilal in Fujairah.

More stations will open in phases:

  • September 30, 2026: Jumeirah Golf Estates (Dubai) and Al Dhaid.
  • November 30, 2026: Madinat Zayed and Liwa.
  • December 30, 2026: Al Dhannah and Al Sila.
  • March 30, 2027: University City in Sharjah.

The phased rollout will continue expanding the UAE’s national passenger rail network, improving connectivity between major cities and regional destinations.

Continue Reading

Health

UAE workplace injury compensation: Know the rules before you claim

Published

on

Spread the love

The UAE’s Ministry of Human Resources and Emiratisation (MoHRE) has clarified six situations in which employees may not receive compensation for workplace injuries or occupational diseases.

The rules are part of the country’s occupational health and safety framework, which aims to reduce workplace accidents while ensuring employers and employees follow safety standards.

When compensation can be denied

According to MoHRE, employees may lose their right to compensation if they:

  • Intentionally injure themselves.
  • Are under the influence of alcohol, drugs, or other intoxicating substances at the time of the incident.
  • Deliberately ignore clearly displayed workplace safety instructions.
  • Cause the injury through intentional misconduct.
  • Refuse, without a valid reason, to undergo a medical examination or follow prescribed treatment.
  • Are found by authorities to have intentionally violated workplace safety regulations.

Employer responsibilities

Under UAE labour laws, employers must provide a safe workplace by:

  • Supplying personal protective equipment (PPE) free of charge.
  • Training employees on workplace safety.
  • Conducting health checks where required.
  • Keeping records of workplace injuries and occupational diseases.
  • Reporting workplace accidents to the relevant medical and police authorities.

Employers are also required to investigate workplace incidents and maintain health records for employees exposed to occupational risks.

Compensation rules

Employers must cover medical treatment costs for work-related injuries and occupational diseases.

Compensation is calculated based on the employee’s latest basic salary and should be paid within 10 days of the medical report determining the level of disability.

If a workplace injury results in permanent disability or death, compensation is paid according to UAE labour regulations, with the final assessment made by a specialised medical committee.

Importantly, employers cannot terminate an injured employee’s contract until all legal entitlements have been settled.

What counts as a work injury?

A work injury includes accidents that happen while performing job duties, as well as certain accidents during direct travel to or from work. Occupational diseases linked to an employee’s job are also covered under UAE law.

Focus on prevention

MoHRE says the regulations are designed to balance employee protection with personal responsibility. While workers are protected when injuries occur during the course of employment, they are also expected to follow workplace safety rules.

The ministry continues to inspect private-sector companies to ensure compliance, helping create safer and healthier workplaces across the UAE.

Continue Reading

India

New Indian passport centres open across UAE under Al Hind

Published

on

Spread the love

Hundreds of Indian nationals visited the UAE’s newly launched Indian Consular Application Centres (ICACs) on Wednesday as the new network officially began operations, marking a major overhaul of Indian passport and consular services in the country.

The centres, operated by Al Hind Tours & Travels, have taken over passport, visa, attestation and other consular application services previously handled at the Indian Embassy in Abu Dhabi and the Consulate General of India in Dubai.

A total of 16 ICAC centres are now operational across the UAE, making it easier for Indian residents to access consular services closer to home.

Speaking at the opening of the flagship centre at UW Mall in Bur Dubai, Mohammed Haris, Chairman and Founder of Al Group of Companies, said demand was high from the moment bookings opened.

Largest centre in Bur Dubai

The Bur Dubai branch is the largest Indian Consular Application Centre in the UAE, featuring 70 service counters with the capacity to serve around 600 applicants a day. The second-largest facility is located in Dubai Investment Park.

Once all 16 centres are fully operational, the network is expected to process up to 8,000 applications daily. Around 350 employees have been recruited to manage operations across the country.

Dh19 service fee

Applicants will pay a Dh19 service charge in addition to the applicable Government of India fee.

The charge includes several services that were previously paid for separately, including passport photographs, photocopying, printing and form-filling assistance.

Al Hind confirmed there are no premium service options, with all applicants receiving the same level of service.

Faster application process

Officials said most applications can be completed in around 30 minutes, provided applicants arrive with the required documents.

Appointments can be booked through the new online portal, with fresh slots released twice daily at 9am and 9pm.

Services available

The new centres offer a full range of Indian consular services, including:

  • Passport applications and renewals
  • Visa services
  • Document attestation
  • OCI (Overseas Citizen of India) services
  • Other consular applications

With the launch of the ICAC network, applicants will no longer need to visit the Indian Embassy in Abu Dhabi or the Indian Consulate in Dubai to submit most routine consular applications.

Continue Reading

Popular

Exit mobile version
https://headline.ae/