Connect with us

News

What to do if WhatsApp stops working on your phone after May 5

Published

on

Spread the love

Users holding on to older smartphones will soon have to say goodbye to WhatsApp. Starting May 5, 2025, the messaging app will stop working on several outdated devices due to updated operating system requirements, Meta has confirmed.

The move is part of WhatsApp’s regular security and performance updates to keep the platform functional with newer mobile technology. While the number of users impacted may be relatively small, those still using a smartphone released over a decade ago could be affected.

Which iPhones Are Losing WhatsApp Support?

iPhones that do not support iOS 15.1 or higher will no longer run WhatsApp. This includes:

  • iPhone 5s
  • iPhone 6
  • iPhone 6 Plus

Although some iPhones can update to newer iOS versions, the above models are capped at iOS 12.5.7 and therefore will lose compatibility.

WhatsApp Dropped Support for These Android Phones in January 2025

WhatsApp previously ended support for Android KitKat (version 4.4) and earlier on January 1, 2025. Users with the following older Android phones can no longer use WhatsApp unless they upgrade to a newer device:

Samsung:

  • Galaxy S3
  • Galaxy Note 2
  • Galaxy Ace 3
  • Galaxy S4 Mini

Motorola:

  • Moto G (1st Gen)
  • Razr HD
  • Moto E (2014)

HTC:

  • One X
  • One X+
  • Desire 500
  • Desire 601

LG:

  • Optimus G
  • Nexus 4
  • G2 Mini
  • L90

Sony:

  • Xperia Z
  • Xperia SP
  • Xperia T
  • Xperia V

How to Check Your Phone’s OS Version

iPhone users:
Go to Settings > General > About and check your iOS version.

Android users:
Go to Settings > About Phone > Android Version.

If your device runs on an unsupported version but is eligible for an update, installing the latest software may restore compatibility. However, some phones no longer receive official updates, and attempting unofficial methods could void warranties or render the device unusable.

What You Can Do

If your device is on the list and no longer updatable, you’ll need to switch to a newer model to continue using WhatsApp or WhatsApp Business. Meta recommends regularly updating both your device and the app to maintain security and performance.

With over 35 years of experience in journalism, copywriting, and PR, Michael Gomes is a seasoned media professional deeply rooted in the UAE’s print and digital landscape.

News

Etihad Rail confirms Abu Dhabi–Dubai–Fujairah as first passenger routes

Published

on

Spread the love

Etihad Rail has finally revealed the first routes on its much-anticipated passenger network, and Dubai is right at the heart of it. The opening phase, set to launch in 2026, will connect Abu Dhabi, Dubai and Fujairah, creating a major rail corridor linking the UAE’s key commercial hubs with the east coast.

The initial rollout will focus on high-demand routes, starting with frequent services between Abu Dhabi and Dubai, followed by a direct connection to Fujairah. More routes and stations are expected to come online later in 2026 and beyond as demand grows.

For Dubai commuters, it’s all about saving on travel time. Journeys between Dubai and Abu Dhabi are expected to take around one hour, while trips from Abu Dhabi to Fujairah will take about 90 minutes. Trains will run at speeds of up to 200 km/h and carry up to 400 passengers, offering a fast alternative to increasingly congested highways.

The Abu Dhabi–Dubai route is expected to see the most frequent services. The Fujairah connection, meanwhile, is designed to boost tourism and improve access to the UAE’s east coast.

Station locations were chosen based on population density and connectivity.

The first passenger stations will be located in Mohamed bin Zayed City (Abu Dhabi), Jumeirah Golf Estates (Dubai), and Sakamkam near Al Hilal City (Fujairah), marking a major step toward a nationwide rail network that could reshape how people move across the UAE.

Continue Reading

News

Headed to University City? Here’s what to know as Sharjah announces road closure for Lights Festival

Published

on

Spread the love

If you’re planning to drive around University City in the coming weeks, take note: the Sharjah Roads and Transport Authority (SRTA) has announced a partial road closure leading to University City Hall as part of preparations for the upcoming Sharjah Lights Festival.

The closure, which began on Tuesday, January 20, will remain in place until Sunday, March 1, coinciding with the festival period. Authorities say the move is aimed at improving traffic management and ensuring the safety of all road users during the busy event season.

Only a portion of the road leading directly to University City Hall will be affected, with traffic continuing to flow through temporary diversions and alternative routes that have already been approved and put in place.

SRTA said the closure forms part of a wider traffic plan developed in coordination with Sharjah Police and other relevant departments, anticipating increased traffic volumes during the festival. The goal is to maintain smooth access for visitors and participants while minimising congestion within University City and the surrounding areas.

To support drivers, authorities have set up clear directional signage, temporary road markings, and alternative routes around the closure zone, ensuring travel times and service quality remain largely unaffected.

Motorists are advised to follow posted detours, comply with instructions from authorities on the ground, and pay close attention to traffic signs to help keep everyone safe and traffic moving smoothly throughout the closure period.

Continue Reading

News

Planning a Ramadan tent in Abu Dhabi? Here’s what you need to know before setting one up

Published

on

Spread the love

If you’re planning to host Iftar or Suhoor gatherings this Ramadan, Abu Dhabi’s Department of Municipalities and Transport has laid out clear guidelines for setting up Ramadan tents, and the good news is, the permit process is free and simple.

Companies and eligible applicants can obtain official approval to install temporary Ramadan tents by logging in with a digital ID, submitting an application, and receiving authorisation, with no additional documents required.

However, there are strict rules to follow.

Key conditions for setting up a Ramadan tent

  • Only one tent is allowed outside the plot’s boundary
  • The tent must not exceed 60 square metres in area
  • Maximum height allowed is 5 metres
  • The tent must be installed only in front of the plot owner’s residence, between the plot boundary and the sidewalk
  • Approved materials include traditional tent fabrics such as wool, Bedouin textiles, tarpaulins, and similar materials

What’s not allowed

  • Blocking streets, sidewalks, or public services
  • Excavation work of any kind
  • Installing tents over service structures or annexes
  • Using cooking equipment or charcoal
  • Any activities involving selling, buying, renting, or promoting

Important responsibilities to note

Permit holders are fully responsible for any damage caused to public or private property during the installation or removal of the tent. Installing a tent in an unauthorised location is considered a violation and may lead to legal action.

Authorities also reserve the right to demand the immediate removal of a tent in cases of emergencies, complaints, or violations of permit conditions.

Additionally, permit holders must exempt the Municipality from any claims or liabilities raised by other entities related to the use of the permit.

While setting up a Ramadan tent in Abu Dhabi is easy and free, following the rules is essential to avoid fines or removal.

Continue Reading

Popular

© Copyright 2025 HEADLINE. All rights reserved

https://headline.ae/